For full features, visit non-AMP version
Switch
Malaysia Feed
EN MS AR
Home Uncategorized Sasar Wardieburn housing project for armed forces personnel to kick off in early 2026, Setapak to follow in 2030
Uncategorized

Sasar Wardieburn housing project for armed forces personnel to kick off in early 2026, Setapak to follow in 2030

Malay Mail
8

AI Summary

Construction of the Satu Anggota Satu Rumah (SASaR) housing project at Wardieburn Camp in Kuala Lumpur, comprising 974 units, is set to begin in Q1 2026. Another SASaR project with 6,400 units at Genting Klang Camp is scheduled for 2030. Currently, a 3,500-unit SASaR project in Sungai Besi is underway, with completion expected in Q4 2023. These projects will bring the total SASaR units in Kuala Lumpur to 10,874. The projects will use a cross-subsidy model without land swaps. The Royal Malaysian Air Force (RMAF) is also expected to receive its first Unmanned Aircraft System (UAS) in 2026.

Read the original article

This article has been processed for multi-language support.

Visit Source

Related Articles

Penang targets diners and eateries in smoking crackdown, 2,647 fines issued so far

Malay Mail

Malaysian girl group DOLLA joins K-pop’s KIIRAS for crossover dance challenges (VIDEO)

Malay Mail

Kick it out: Transphobia, sexism rise in UK football; fans demand red card for hate

Malay Mail

Serie A footballers to face 25pc pay cut if relegated under new deal, starting from Sept 

Malay Mail